SDC was appointed by the National Trust for Scotland to lead the reconfiguration of electrical power supplies at the Glenfinnan Viaduct Visitor Centre, a site globally recognised as the “Harry Potter Bridge.” The project responded to increasing visitor numbers, ageing infrastructure, and the need for a more resilient, future proofed electrical system.
SDC carried out a detailed load assessment and future demand forecast, accounting for planned upgrades such as EV charging, café expansion, and seasonal events. Multiple supply strategies were considered, balancing capacity, sustainability, and minimal disruption to the heritage site. The final design included a restructured LV distribution system with enhanced resilience, coordinated EV supply points with load management, and infrastructure ready for future integration of solar PV and battery storage.